Complete Dasheri Mango Commercial Farming Guide — 5-Year Plan

Premium Landscape

Plant Dasheri grafted seedlings at 5×5 m spacing on loamy/sandy loam soil (pH 6.5–7.5). Irrigate daily for young trees, then reduce; stop completely during flowering. Fertilize twice a year with NPK + FYM, add Zinc & Boron from Year 3. Prune seedlings to shape branches, maintain canopy in fruiting years, and monitor pests like Mealybugs, Fruit Fly, and Stem Borer. Intercrop in Years 1–3 for extra income.

Location: Kanpur / Uttar Pradesh
Crop: Dasheri Mango
Type: Commercial Farming
Duration: 5 Years
Plant Cost: ₹130 per tree
Potential Earnings: Up to ₹1.4 lakh/acre

Table of Contents

  1. Introduction to Dasheri Mango
  2. Soil and Climate Requirements
  3. Plantation Costs
  4. Year-by-Year Plan & Maintenance (Years 1–5)
  5. Fertilizer Schedule
  6. Irrigation Schedule
  7. Pest and Disease Management
  8. Fruit Development and Harvesting
  9. Marketing and Sales
  10. 5-Year Profit Summary
  11. Pro Tips to Maximize Returns

1. Introduction

Dasheri mango is one of the most popular and aromatic varieties. It has a thin skin, sweet flavor, and delightful aroma, making it highly marketable both domestically and internationally.

  • Origin: Malihabad, UP
  • Taste: Sweet and aromatic
  • Ripening Period: June–July
  • Average Fruit Weight: 150–200 g
  • Market Price: ₹25–60/kg
  • Export Destinations: UAE, UK, USA

2. Soil and Climate Requirements

  • Soil: Loamy or Sandy Loam
  • pH: 6.5 – 7.5
  • Temperature: Summer 24–48°C, Winter above 10°C
  • Annual Rainfall: 700–1200 mm
  • Drainage: Must be well-drained

Kanpur and nearby regions provide ideal conditions for Dasheri mango cultivation.

3. Plantation Costs

Recommended spacing: 5×5 meters (high-density planting, 160 plants/acre) to get fruit in 3–4 years.

ItemCost per PlantCost per Acre (160 plants)
Grafted Plant (3–4 ft)₹130₹20,800
Fertilizer (1–2 kg)₹20₹3,200
Labour (Planting)₹5₹800
Pit Digging & Filling₹15₹2,400
First Irrigation₹5₹800
Total Plantation Cost₹175₹28,000

Pit Size: 1m × 1m × 1m
Filling Mix: 50% soil + 50% FYM + 100g Chlorpyrifos (for termites)

4. Year-by-Year Plan & Maintenance

Year 1 — Establishment

Goal: Develop a strong root system and healthy seedlings.

ActivityDetails
Pit Preparation (May)Fill with soil + FYM + Chlorpyrifos
Plantation (June–July)Plant grafted seedlings at 5×5 m spacing
IrrigationDaily first 2 weeks, then every 3 days
Weed Control & Mulching2–3 hoeings; maintain mulch to conserve moisture
FertilizerHalf-dose NPK in June, second dose Sept–Oct
PruningShape seedlings, remove weak or crossing branches
IntercroppingMoong, Urd, Arhar for extra ₹8,000–12,000/acre

Fruit: None
Net Profit: -₹28,000 to -₹35,000/acre

Year 2 — Vegetative Growth

Goal: Build tree structure for future fruiting.

ActivityDetails
Fertilizer (Feb)200g Urea + 400g SSP + 200g MOP + 15 kg FYM
IrrigationEvery 7–10 days; maintain soil moisture
Monsoon CareNo irrigation; ensure proper drainage
Pest & DiseaseMancozeb 2.5g/L for fungus; monitor stem borer
PruningRemove dead branches, train lateral shoots
IntercroppingPulses or short-term vegetables
Weed ControlMaintain mulch and clear weeds

Fruit: Minimal
Net Profit: Break-even or minor

Year 3 — First Fruiting

Goal: Manage first fruits and ensure tree health.

ActivityDetails
Fertilizer (Feb)350g Urea + 600g SSP + 300g MOP + 20 kg FYM + Zinc + Boron
Flowering (Mar)Stop irrigation to avoid flower drop
Pest Control (Mar–Apr)Imidacloprid + Sulfur for Mealybug + Powdery Mildew
Fruit Set (Apr–May)Irrigate every 15 days; support small fruits
Pre-Harvest (Jun)Select A-grade fruits
Harvest (Mid-June–July)Careful collection and grading
Post-HarvestPrune old or diseased branches

Net Profit: ~₹6,000/acre

Year 4 — Full Fruiting

Goal: Maximize yield and fruit quality.

ActivityDetails
Fertilizer (Feb)500g Urea + 800g SSP + 500g MOP + 25 kg FYM + micronutrients
Flowering (Mar)Stop irrigation; monitor pests
Pest ControlMalathion 2ml/L (fruit fly), Imidacloprid (Mealybugs)
Fruit Growth (Apr–May)Irrigate every 15 days; support heavy branches
Pre-Harvest (Jun)Grade fruits into A/B/C categories
Harvest (Mid-June–July)Main harvest; maintain packing standards
Post-HarvestPruning and canopy management

Net Profit: ~₹50,000/acre

Year 5 — Peak Fruiting

Goal: Full yield, premium quality, export-ready fruits.

ActivityDetails
Fertilizer (Feb)750g Urea + 1 kg SSP + 750g MOP + 30 kg FYM + Zinc + Boron
Flowering (Mar)Stop irrigation; monitor carefully
Pest ControlFruit fly, Mealybug, stem borer — on schedule
Fruit Growth (Apr–May)Irrigate every 15 days; proper nutrition
Pre-HarvestSelect top-quality fruits (A-grade)
Harvest (Mid-June–July)Export or premium market
Post-HarvestPruning and canopy shaping

Net Profit: ~₹1,43,000/acre

5. Fertilizer Schedule

YearUrea (N)SSP (P)MOP (K)FYMCost/Plant
1100g200g100g10 kg₹20
2200g400g200g15 kg₹35
3350g600g300g20 kg₹55
4500g800g500g25 kg₹85
5750g1 kg750g30 kg₹130

Micronutrients: Zinc Sulfate 500g + Boron 100g per plant from Year 3 onwards

6. Irrigation Schedule

StageFrequencyNotes
New Plant (Year 1)Daily → every 3 daysFirst 2 weeks daily
Growing StageEvery 7–10 daysMaintain soil moisture
Flowering (Feb–Mar)Stop completelyPrevent flower drop
Fruit Set (Mar–May)Every 15 daysSupport fruit development
Monsoon (Jun–Sep)NoneRain sufficient
MethodDrip irrigationEfficient; prevents waterlogging

7. Pest & Disease Management

MonthPurposeChemical
Oct–NovFungus preventionCarbendazim 1g/L
Dec–JanPre-flowering protectionMancozeb 2.5g/L
FebMealybug + Powdery MildewImidacloprid + Sulfur
Mar–AprFruit fly controlMalathion 2ml/L
May–JunPre-harvestKaolin clay or skip
Jul–AugPost-harvest stem borerChlorpyrifos 2ml/L

Mealybug is the most damaging pest; monitor carefully Jan–Feb

8. Fruit Development & Harvesting

  • Feb–Mar: Flowering — no water
  • Mar–Apr: Fruit set visible
  • Apr–May: Growth stage
  • 1st Week June: Fruit ripening test
  • 15 June–10 July: Main harvest
  • Jul–Aug: Post-harvest care, pruning

Ripeness Indicators: Yellow-green color, slight softness, aroma; do not harvest completely green fruits.

9. Marketing & Sales

  • Local Markets: Kanpur, Lucknow, Malihabad APMC, Unnao, Delhi Azadpur
  • Direct Selling: Amazon, Flipkart, WhatsApp groups, Supermarkets, Export
  • Grading & Price:
    • A-grade: 200g+, clean → ₹50–70/kg
    • B-grade: Juice/pulp → ₹15–20/kg
    • C-grade: Local market → ₹10/kg

Direct buyers or commission agents give ₹5–10/kg more than selling in the mandi.

10. 5-Year Profit Summary

YearCost/AcreRevenue/AcreNet Profit
1₹35,000₹0-₹35,000
2₹20,000₹0-₹20,000
3₹18,000₹24,000+₹6,000
4₹22,000₹72,000+₹50,000
5₹25,000₹1,68,000+₹1,43,000
Total 5 Years₹1,20,000₹2,64,000+₹1,44,000

11. Pro Tips

  1. Intercrop during Years 1–3 for extra ₹10,000–15,000/acre
  2. Use high-density plantation to reduce time to first fruit
  3. Never water during flowering to avoid flower drop
  4. Monitor Mealybug, Fruit Fly, Stem Borer; spray on schedule
  5. Grade fruits for maximum return; A/B/C classification matters
  6. Contact buyers before harvest for higher prices
  7. Post-harvest pruning improves next-year yield

✅ This is a fully paraphrased, ready-to-use English guide, clean and professional, with all 5 years, maintenance, fertilizer, irrigation, pest control, harvesting, and profits.


12. Dasheri Mango 5-Year Monthly Activity Calendar

YearMonthActivity
Year 1MayPrepare pits (1m³); mix 50% soil + 50% FYM + 100g Chlorpyrifos; plan high-density layout (5×5 m)
 JunePlant grafted seedlings; start daily irrigation for 2 weeks
 JulyReduce irrigation to every 3 days; apply first half-dose of NPK + FYM; hoe 2–3 times for weed control
 Aug–SepIntercrop Moong, Arhar, or vegetables; maintain irrigation and mulch; monitor pests
 Oct–NovFungus prevention: Carbendazim 1g/L spray
 Dec–JanPre-flowering protection: Mancozeb 2.5g/L spray
 FebApply second half-dose NPK + FYM; prune seedlings to shape branches
 MarStop irrigation to prevent flower drop; continue weed control
 Apr–MayMulch and maintain soil; remove weak shoots
Year 2FebFertilizer: 200g Urea + 400g SSP + 200g MOP + 15kg FYM; apply micronutrients if needed
 MarStop irrigation during flowering; monitor pests
 Apr–MayIrrigate every 7–10 days; prune lateral shoots
 Jun–SepMonsoon care; drainage maintenance; weed control; continue intercropping
 Oct–NovFungus prevention: Carbendazim 1g/L
 Dec–JanMancozeb 2.5g/L; pre-flowering pest control
Year 3FebFertilizer: 350g Urea + 600g SSP + 300g MOP + 20kg FYM + Zinc + Boron
 MarFlowering; stop irrigation; spray Imidacloprid + Sulfur for Mealybug & Powdery Mildew
 Apr–MayFruit set stage; irrigate every 15 days; support small fruits; prune weak branches
 June (1st week)Test ripening; monitor fruit size and color
 Mid-June–JulyMain harvest; grade A/B/C fruits; post-harvest pruning
 Jul–AugPost-harvest care; remove dead branches; maintain mulch
 Oct–NovFungus prevention; maintain soil moisture
 Dec–JanPest control; plan next-year fertilization
Year 4FebFertilizer: 500g Urea + 800g SSP + 500g MOP + 25kg FYM + micronutrients
 MarFlowering; stop irrigation; spray for pests
 Apr–MayFruit growth; irrigate every 15 days; support branches
 Mid-June–JulyMain harvest; grade fruits; maintain post-harvest pruning
 Jul–AugPrepare canopy for next season; weed and mulch maintenance
 Oct–NovFungus prevention; monitor stem borer
 Dec–JanPest control; prune weak shoots
Year 5FebFertilizer: 750g Urea + 1 kg SSP + 750g MOP + 30kg FYM + Zinc + Boron
 MarFlowering; stop irrigation; spray for Mealybug, Fruit Fly, Stem Borer
 Apr–MayFruit growth; irrigate every 15 days; ensure nutrition
 Mid-June–JulyPeak harvest; export or premium market; grade A/B/C fruits
 Jul–AugPost-harvest pruning; maintain canopy; prepare for next season
 Oct–NovFungus prevention; monitor soil health
 Dec–JanPest control; plan fertilization for Year 6 (if continuing)